|
Num Posts
Sort Order
|
pupstoys
New User
| Posts: 5
| Joined: 02/08
Posted: 02/26/08 10:27 AM
|
|
going to install a 1990 for f350 dana 60 front axle into a 1997 ford f250 powerstroke doner truck is complete can anyone think of anything i might need to get before hauling off donor truck taking everything from frame down off front end i.e. track bar and bracket, pitman arm,sway bar, and front end of course?
|
96ford78
New User
| Posts: 4
| Joined: 02/08
Posted: 02/26/08 06:08 PM
|
|
I did my 96 f250 but I used a 87 f350 axle. I went with this for the kingpin setup. I had completly rebuilt the 60 prior to doing the swap. all of the parts swap over as far as I know. I did aftermarket steering though. Make sure you have u bolts and center pins for the leafs if you are pulling the leafs apart to add a leaf or something. Always replace the u bolts after they have been used. For 40 bucks or so It could save you and your truck from a huge problem.
|
|
Posted: 02/29/08 08:29 PM
|
|
I'm doing a 1997 explorer. how are you handling the "ABS" braking system?
|
|
|
pupstoys
New User
| Posts: 5
| Joined: 02/08
Posted: 02/29/08 10:33 PM
|
|
the rigs im working with only have rear abs. what front end are you going to use?
|
pupstoys
New User
| Posts: 5
| Joined: 02/08
Posted: 02/29/08 10:39 PM
|
|
you must have done cross over high steer? I was just hoping the pitman arm and tie rods off the "90" would bolt right on "97 not super duty" steering box.
|